高溫剛體行車滑觸線安裝工序
更新時(shí)間:2013-11-22  瀏覽次數(shù):

      高溫剛體行車滑觸線應(yīng)用范圍較廣,載流量大,強(qiáng)度高,可是適用于比較惡劣的環(huán)境中,比如煉鋼廠、碼頭、冶金、化工車間。今天小編給大家講講解下高溫剛體行車滑觸線的安裝工序:

1.安裝角鋼支架 (Installation of angle steel bracket )

      用螺栓或焊接方式按規(guī)定間距把角鋼支架固定在行車道軌軌梁上。必須保證支架在整個(gè)線上的平直,角鋼的伸出尺寸一致,角鋼要平行不能歪斜。(Fix angle steel brackets on track rail tie-plate as per specified spacing by using bolt or welding method. It is essential to ensure that brackets are straight on the whole line, extruding dimensions of angle steel are identical and angle steels should be paralleled with each other rather than inclined.)

2. 安裝滑觸線及接頭 (Installation of sliding-contact wire and connector )

      把吊掛夾套在滑觸線上,吊掛夾卡住滑觸線卡口,將吊掛夾安裝在角鋼支架上,螺母不要擰緊。四根滑觸線裝好后調(diào)平,旋緊吊掛夾的螺母。把接頭裝入第一組滑觸線的另一端,同樣方法安裝第二組滑觸線。用接頭將兩根滑觸線聯(lián)接好,裝上接頭護(hù)套,將滑觸線調(diào)平、固緊。依次裝好全部滑觸線。注意接頭處應(yīng)平滑,間隙<0.5mm (Fix suspension clip on sliding-contact wire, and fix suspension clip in bayonet of sliding-contact wire, install suspension clip in angle steel bracket but do not tighten nut. After installation and leveling of four pieces of sliding-contact wire, screw nut of suspension tightly. Fix connector into the other end of the first group of sliding-contact wires, and install the second group of sliding-contact wires in accordance with the same method. Connect two pieces of sliding-contact wire by connector, install connector sheath, level and fasten sliding-contact wire. Install all sliding-contact wires in proper order. Make sure to keep smoothness at joints and spacing<0.5mm. )

3.安裝動(dòng)力輸入段 (Installation of power input section )

      按預(yù)先設(shè)計(jì)好的輸電方式和設(shè)計(jì)位置安裝動(dòng)力輸入段,螺栓一定要旋緊,再裝上護(hù)罩。(Install power input section as per the power transmission method and design position that have been designed in advance, and make sure to screw it tightly before installation of protection cover.

4.裝護(hù)套固定夾 (Installation of sheath )

      按照設(shè)計(jì)方案安裝固定夾,一條線二個(gè)。 (Install retaining clip as per design, two clips for each wire. )

5.膨脹段和檢修段的安裝 (Installation of expansion section and inspection/maintenance section )

      方法同接頭的安裝,安裝位置應(yīng)按設(shè)計(jì)方案定。 (The method is identical with installation of connector, and installation positions are to be determined as per design.)

6.裝端套 (Installation of pothead)

       在滑觸線的兩頭安裝端套,也可在吊掛前先裝上。 (Install potheads on both ends of sliding-contact wire, it is also allowed to install before suspension. )

7.檢查 (Inspection)

       整條滑觸線安裝好后應(yīng)認(rèn)真檢查,滑觸線是否平直,間距是否一致,吊掛架是否旋緊。接頭處是否平滑。 (After completion of installation of the whole sliding-contact wire, it is necessary to inspect carefully whether sliding-contact wire is straight, whether spaces are identical, whether suspension is screwed tightly, and whether joints are smooth. )

8.安裝集電器及其支架 (Installation of current collector and its bracket )

      滑觸線安裝好后,即可安裝集電器,按照高度尺寸H(支架中心到滑靴上平面的高度尺寸)和觸靴端中心略高些的要求,把支架焊接在移動(dòng)的設(shè)備上,再將集電器依次安裝到集電器支架上旋緊固定。檢查觸靴是否轉(zhuǎn)動(dòng)靈活,與導(dǎo)線的接觸是否良好,否則應(yīng)進(jìn)行調(diào)整。( After installation of sliding-contact wire, proceed with installation of current collector, in accordance with height dimension H (height from bracket center to upper surface of contact slipper) and requirement that the center of contact slipper side should be slightly higher, weld bracket on mobile equipment, then install current collectors in proper order on collector bracket and screw tightly. Inspect whether contact slipper turns flexibly, whether the contact with conductive wire is good, otherwise it is necessary to adjust. )

9.集電器接線 (Wire connection of current collector )

      將集電器的電纜與用電設(shè)備電源電纜接好。注意在接線前,應(yīng)按常規(guī)檢查設(shè)備及相關(guān)電器電機(jī)的各項(xiàng)絕緣要求是否符合要求,若出現(xiàn)異常應(yīng)檢修或更換。(Connect cable of collector with power supply cable of power consumption equipment. Before wire connection, make sure to inspect whether insulation requirements of equipments, electric appliance and electric motor are met, in case of abnormity, it is necessary to inspect, repair or replace.)

10.接電源 (Connection of power supply)

       把電源線牢固的接在動(dòng)力輸入段上,注意壓緊。不得有松動(dòng)現(xiàn)象。 (Connect power supply line firmly on power input section, and make sure to press tightly. There should be no loose phenomenon. )

11.試車 (Trial run)

       先應(yīng)空載試車,往復(fù)運(yùn)行幾個(gè)來(lái)回,若無(wú)異常即可投入負(fù)荷試車,觀察電壓、電流是否正常,若有異常應(yīng)立即停車,切斷電源,進(jìn)行檢查,故障排除后再投入運(yùn)行。(Firstly, it is necessary to conduct trial run for several times of reciprocating operation under no load, proceed with under-load trial run if there is no abnormity, observe whether voltage and current are normal, shut down immediately in case of abnormity, disconnect power supply and inspect, and proceed with operation again after elimination of malfunctions.)

< 上一篇 返回列表 下一篇 >
主站蜘蛛池模板: 亚洲欧美日韩精品久久 | 最新视频-x88av| 日产日韩亚洲欧美综合 | 4虎最新地址 | xxxx黄色片| 日本无遮挡色又黄的视频 | 国产激情无码视频在线播放性色 | 亚洲三区一区 | 亚洲免费视频中文字幕 | 久久av视频| 日本十八禁视频无遮挡 | 99久久久久免费精品国产 | 欧美日韩综合一区二区在线观看视频 | 一区2区3区在线看 | 免费黄色一级 | 国产精品久久久久久 | 亚洲成成熟女人专区 | 女性喷液过免费视频 | 国产妇女乱码一区二区三区 | 国产网红主播精品一区二区三区 | 亚洲高清无吗 | 久久精品中文骚妇内射AV | 日本伦理片在线播放 | 97色成人网 | 91看点| 色吧av| 亚洲成人综合网站 | 亚洲第一网站男人都懂 | 边添小泬边狠狠躁视频 | 一区两区三区四区乱码国产精品 | 婷婷久久综合九色综合88 | 日韩av一区二区三区四区 | 好大好爽好深国产在线 | 亚洲色大成网站久久久 | 老司机带带我免费视频 | 亚洲爆乳中文字幕无码专区网站 | 中国少妇内射XXXXⅩ | 日韩免费观看高清 | 中文字幕乱码中文乱码51精品 | 国产在线一二三四区 | 青草综合一区二区三区 |